It is suggested to form a team comprising of decision-makers,
engineering and production mangers. This ensures Client's participation
and facilitates comprehensive data collection and analysis. The team
ensures immediate and correct evaluation of all suggestions.
The basic study is conducted in two visits, spread
over a period of 30 to 60 days. The data collection and analysis is
jointly carried out at site. This generates practical suggestions by
weeding out errors, anomalies and controversies. A site report is
prepared & discussed during each visit; also to finalize action plan
& implementation schedule. This ensures collective responsibility
and facilitates speedy implementation.
Further, visits are planned at periodical
intervals to provide necessary support during implementation and
monitor actual savings. A visit report also documents progress of
implementation, actual savings, difficulties & trouble shooting
activities.
The overall duration of the study is around six
months. This ensures coverage of as many potential areas as possible
and helps in devising control & monitoring system.
The final report is presented at the end of the
studies.
The study shall be carried out to identify saving
potential / gains through
• Mechanical Equipments - pumps, boilers,
refrigeration, air compressors
• Distribution Systems - electricity, steam, compressed air, etc.
• Process Equipments - dryers, evaporators, etc.
• Utility Consumers - reactors, non-standard equipments
• Recovery of Waste Energy - electrical & thermal
• Usage of Cheaper Sources of Energy
• Optimizing Unit Cost of Energy - fuel & electricity analysis of
specific energy consumption
• Energy Monitoring & Reporting System
Implementation
The change is always associated with small
difficulties or teething troubles; which are quite common even while
implementing a perfectly feasible recommendation. The problem is
compounded by hectic schedule and other preoccupations of
coordinating departments.
A small failure / difficulty may retard the tempo,
slowing or even abandoning the process of implementation. The
purpose of Energy Audit is defeated if suggestions are not put into
practice.
Similarly, monitoring the energy consumption and
establishing the savings is an integral part of energy conservation
activities. The services are aimed at providing assistance for quick
& effective implementation. The duration is six to twelve months
with periodic visits and regular interactions.
Project Audit
Project Audit is basically Energy Audit at
project stage which can
· Reduce capital cost by correct sizing of the
utility equipment
· Assist in selecting the best possible equipment based on life
cycle cost
· Help in sizing and preparation of layout of distribution networks
· Incorporate energy related parameters in the specification sheets
· Help in devising performance testing
· Suggest energy metering & monitoring system
We can be associated right from inception to
commissioning so as to build in energy efficiency & monitoring at
the project stage.
Empanelled Consultant with
Maharashtra Energy Development Agency (MEDA)
Gujarat Energy Development Agency (GEDA)
We intent to apply for empanelment with Bureau of
Energy Efficiency (BEE, New Delhi) as and when the procedure is
initiated.
List of Instruments
The energy audit involves the use of a wide range
of sophisticated, portable diagnostic & measuring instruments to
generate refined data & facilitate incomplex analysis that would
give a more reliable basis for evolution of energy saving potential
& economic viability.
List of Instruments
Instrument No. Description
SCPL / 01 Enercon Power Meter
SCPL / 02 Nanovip - 1000
SCPL / 03 Electronic Gas Analyser
SCPL / 04 Temperature Indicator Liquid
SCPL / 05 Temperature Indicator Surface
SCPL / 06 Anemometer
SCPL / 07 Hygro Temperature Indicator
SCPL / 09 Nanovip - 200
SCPL / 10 Digital Manometer
SCPL / 11 Ultrasonic Flowmeter
SCPL / 12 Whirling Hygrometer
|